CET 2023 Slot 1 Question Paper with Solutions PDF – Page 29
All 200 questions of CET 2023 Slot 1. Tap Show answer, or open the detailed solution (free login). Page 29 of 42.
Direction (121-125) : In the following questions, out of the four alternatives, one word is
correctly spelt. Find the correctly spelt word.
(A) Irelevent
(B) Irrelevent
(C) Irrelevant
(D) Irelevant
correctly spelt. Find the correctly spelt word.
(A) Irelevent
(B) Irrelevent
(C) Irrelevant
(D) Irelevant
Answer: C. Irrelevant
Solution — first steps
Irrelevant takes double r and ends-levant. C.
The full step-by-step working opens with a free login.
Direction (121-125) : In the following questions, out of the four alternatives, one word is
correctly spelt. Find the correctly spelt word.
(A) Allineate
(B) Alienate
(C) Alienatte
(D) Allienate
correctly spelt. Find the correctly spelt word.
(A) Allineate
(B) Alienate
(C) Alienatte
(D) Allienate
Answer: B. Alienate
Solution — first steps
Alienate is correctly spelt. B.
The full step-by-step working opens with a free login.
Direction (121-125) : In the following questions, out of the four alternatives, one word is
correctly spelt. Find the correctly spelt word.
(A) Concede
(B) Conceed
(C) Consede
(D) Conseed
correctly spelt. Find the correctly spelt word.
(A) Concede
(B) Conceed
(C) Consede
(D) Conseed
Answer: A. Concede
Solution — first steps
Concede is correctly spelt, with one e before the final de. A.
The full step-by-step working opens with a free login.
A builder appoints three construction workers Akash, Sunil and Rakesh on one of his
sites. They take 20, 30 and 60 days respectively to do a piece of work. How many days will it
take Akash to complete the entire work if he is assisted by Sunil and Rakesh every third day?
A.10 days
B.15 days
C. 25 days
D. 30 days
E. 45 days
sites. They take 20, 30 and 60 days respectively to do a piece of work. How many days will it
take Akash to complete the entire work if he is assisted by Sunil and Rakesh every third day?
A.10 days
B.15 days
C. 25 days
D. 30 days
E. 45 days
Answer: B. 15 days
Solution — first steps
Akash rate1/20, helpers together1/30+1/60=1/20. Each three-day block completes3/20+1/20=1/5.
The full step-by-step working opens with a free login.
To complete a piece of work, Samir takes 6 days and Tanvir takes 8 days alone
respectively. Samir and Tanvir took Rs.2400 to do this work. When Amir joined them, the work
was done in 3 days. What amount was paid to Amir?
A. Rs. 300
B. Rs. 400
C. Rs. 800
D. Rs. 500
E. Rs. 100
respectively. Samir and Tanvir took Rs.2400 to do this work. When Amir joined them, the work
was done in 3 days. What amount was paid to Amir?
A. Rs. 300
B. Rs. 400
C. Rs. 800
D. Rs. 500
E. Rs. 100
Answer: A. Rs. 300
Solution — first steps
In3days Samir does1/2 and Tanvir3/8; Amir does1/8. His proportional payment=2400/8=300,A.
The full step-by-step working opens with a free login.